All matters relating to equipment has special significance because it represents, in the event that the Company is the owner of the equipment, strong investment, which must be retrieved at the time agreed, through the Estimates are made for their use, these estimates should be supported by the analysis of unit prices, which will be our part to demonstrate that the values \u200b\u200bthat we intend to charge, are properly supported.
In another sense, if we feel the need to rent the machines we will use, we must be sure what the real cost of the machine hours in question, so that our budget has real values.
Often the construction equipment is listed in U.S. dollars, therefore we must be aware of the price of our currency, if it is slipping fast, to be envisaged which could be their replacement cost in order to take relevant measures when considering the price.
In this short course as we have reiterated, we are looking at prices that are needed to build a house, so we might need to rent a machine, which could be: Mixer, concrete vibrator and not very common case, a backhoe bucket.
In another sense, if we feel the need to rent the machines we will use, we must be sure what the real cost of the machine hours in question, so that our budget has real values.
Often the construction equipment is listed in U.S. dollars, therefore we must be aware of the price of our currency, if it is slipping fast, to be envisaged which could be their replacement cost in order to take relevant measures when considering the price.
In this short course as we have reiterated, we are looking at prices that are needed to build a house, so we might need to rent a machine, which could be: Mixer, concrete vibrator and not very common case, a backhoe bucket.
now proceed to carry our database, remember that in case of opting for the alphanumeric system, we will use the letter "Q" to denote the elements of this base. As in the Database of Manpower, this will not have many ideas, but may be growing as our needs to be increased.
In this image we can realize that there is a difference, as mentioned above, occasionally these machines are quoted in U.S. dollars, so in "F5" we noted the exchange rate and "E5" the value of the Value Added Tax, which in the case of Ciudad Juárez, is 10%, here are the operations follows:
Place the cursor in the "E11" and put the "=", indicating that we will do an arithmetic operation, you type the "*" multiply by noting that the value we have set to "F11" , then move the cursor to "F5" (exchange rate) and re-enter the "*" and move the cursor to "E5" (the VAT) and we "enter"
x F5 = 2828.00 (10.50) x E5 (1.10) = 32663.40
This is the value to be set to "E11"
Place the cursor in the "E11" and put the "=", indicating that we will do an arithmetic operation, you type the "*" multiply by noting that the value we have set to "F11" , then move the cursor to "F5" (exchange rate) and re-enter the "*" and move the cursor to "E5" (the VAT) and we "enter"
x F5 = 2828.00 (10.50) x E5 (1.10) = 32663.40
This is the value to be set to "E11"
When machinery we have been quoted in U.S. Dollars only get in the box the price before VAT and multiply by what is noted in "E5"
= 750000 * $ E $ 5 = 825,000.00
is important to always do the operations by formulas, because this way it is easier update. Even more efficient you can do if you put in an additional column prices before VAT, because if you would type only price changes new price will automatically update your catalog. We have lists
our three databases, we can now begin to develop our Matrix of Cost Analysis, begin with the section "Primary"
= 750000 * $ E $ 5 = 825,000.00
is important to always do the operations by formulas, because this way it is easier update. Even more efficient you can do if you put in an additional column prices before VAT, because if you would type only price changes new price will automatically update your catalog. We have lists
our three databases, we can now begin to develop our Matrix of Cost Analysis, begin with the section "Primary"